Water main under a busy intersection

In August 2022, Brownline has surveyed a drilling in Rouveen, in Overijssel. Contractor J. de Lange Vroomshoop installed...

Read more
Fiber optic cable drilling with complex S-curve in Belgium

In August 2022, Brownline surveyed the pilot drilling for the installation of a fiber optic connection under the Scheldt...

Read more
21 crossings in the heart of Toronto and Mississauga

In the summer of 2021, Brownline Canada helped break a national record: Michels Canada completed a 3,540 m / 11,614 ft...

Read more
Drilling through the polder for grid expansion “Lighthouse Island”

In August 2022, Brownline was commissioned by Heijmans to survey a bore in a polder near Amsterdam. This bore served to...

Read more
14 bores for wind farm Maasvlakte 2

In May and June 2022, Brownline has contributed to the construction of a large wind farm on the beach of Maasvlakte 2,...

Read more
Heat pipelines for Grolsch under the motorway

In June 2022, Brownline was involved in two parallel drillings in Enschede. A heat pipeline was to be connected to the...