The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Uphill drilling in the Moselle Valley in Germany to connect a solar farm

In December 2023, Brownline surveyed an HDD crossing to install solar energy cables in the German town of Sankt Aldegund....

Read more
More than 20 HDDs for 23 km / 14 mi long gas pipeline

Between May and September 2024, Brownline has surveyed a large number of horizontal directional drills to install a new...

Read more
Curved HDD crossing to install a new water main in eastern England

In July 2024, Brownline surveyed an HDD crossing near Feltwell, in the east of England. A new water pipeline network is...

Read more
Short S-curve under beautiful polder in Rijpwetering

In August 2024, Brownline surveyed a pilot drill for a project in Rijpwetering. Under a typical Dutch polder, a cable...

Read more
Drilling in an underground full of pipelines and under a railroad

In July 2024, Brownline surveyed a drilling in Heiloo, in the north of the Netherlands. A new electrical line was being...

Read more
Two drillings for new water catchment area in Salland, The Netherlands

In July 2024, Brownline surveyed two drillings in the Dutch province of Overijssel. In the Salland region, near Holten,...

Read more