The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Pressure-While-Drilling (PWD) protects the old inner city of Bruges

A well-known Belgian brewery commissioned a pipeline to transport their beer. The pipeline would run straight through...

Read more
Longest Cable duct in Bahrain

Brownline executed a drilling in Bahrain to install a power line next to the Prince Khalifah Bin Salman Causeway Bridge....

Read more
Johan Sverdrup Pipeline, Mongstad Norway

Johan Sverdrup is one of the five largest oil fields on the Norwegian continental shelf. With expected resources of between...

Read more
4 parallel drills for network platform DolWin 6

In 2018, Brownline surveyed a series of directional drills for the offshore grid connection project 'DolWin 6'. Two sets...

Read more
Free fall HDD in Cyprus

Brownline recently surveyed a free fall HDD in the beautiful mountains on the isle of Cyprus. The high demands on tolerance...

Read more
721 foot deep intersect under Mackenzie river (NWT)

In 2018, Brownline Canada has successfully executed a 220 meter deep drill crossing the Mackenzie River. Some years prior,...