Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Crossing the river Po

Close to the picturesque town of Valenza, situated at the border of Piemonte and Lombardy, Brownline has successfully...

Read more
Record drill under Missouri river

In 2019, Brownline has taken part in a US national record length drill of 13,247 foot (4.037 meter) in North Dakota. ...

Read more
Victoria Harbour crossing

Our Canadian operations are proud to have assisted in the completion of a 940m crossing under Victoria Harbour in 2019...

Read more
Crossing Calgary International Airport

In 2019, Brownline Canada has completed a 1094m crossing for a 12” pipeline, which is now responsible for the safe...

Read more
Record breaking drilling job in Texel, The Netherlands

In 2017, Brownline successfully performed steering services for the longest ever horizontal directional drill! An embedded...

Read more
District heating in Rotterdam, The Netherlands

A connection for the district heating system in Rotterdam needed to be installed under a part of the port of the city....

Read more