Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Renewing the power lines of America’s first offshore wind farm

America’s first offshore wind farm was constructed in 2016 and can be found just out of the Rhode Island coast line....

Read more
Radar drill for a new 50KV power line

Throughout The Netherlands, a wide range of projects are underway in contribution to the transition to renewable energy....

Read more
Continuing the home game; 2.200 meter drill under vulnerable nature

In the fall of 2020, Brownline worked on a project consisting of three 1.100 meter drills in our own backyard in preparation...

Read more
Tropical shore approach at Jaconé beach, Brazil.

The Rota 3 gas pipe line is part of a big project set out by a large oil and gas provider in Brazil. For this project,...

Read more
Intersect drill in the port of Hamburg, Germany

For the expansion of the Nord-West long-range oil pipeline, Brownline surveyed an intersect drill in the port of Hamburg,...

Read more
Drilling with the precision of a Swiss watch in Neuchâtel, Switzerland

In the spring of 2020, Brownline surveyed a 840 meter long drill job right in the middle of the Swiss city of Neuchâtel....

Read more