Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Connecting under the river; an intersect drill in the Dutch Alblasserwaard area

In 2020, Brownline has surveyed an intersect drill in the Dutch city of Papendrecht, for which the intersect point was...

Read more
Alberta Products Pipeline renovation project, Canada

With the surveying of 8 crossings of a total length of 4.400 meters, Brownline Canada has helped to realize phase 3 of...

Read more
A home game for Brownline: drilling in our "backyard"

In 2020, Brownline has surveyed three drills of 1.100 meter (3600 ft.) each. These works are part of preparations...

Read more
On the right track: drilling underneath the high-speed railway, Belgium

In the summer of 2020, Brownline surveyed two drills in the Belgian province of Henegouwen. These drills were for a new...

Read more
Wind farm Neeltje Jans, Zeeland province, The Netherlands

The Oosterscheldekering (Eastern Scheldt storm surge barrier) is a prime example of Dutch flood control management. This...

Read more
Rocky View Section Pipeline Project, Alberta, Canada

In 2020, Brownline Canada has successfully contributed to the Rocky View Section of the Western Alberta System Mainline...

Read more