The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Four HDD crossings for undergrounding of 150 kV lines

In September 2023, Brownline contributed to four directional drillings in Breda. Here, an overhead powerline above the...

Read more
Long parallel crossings under many obstacles in Rijswijk

In June 2023, Brownline contributed to the completion of two parallel crossings in Rijswijk. To install heat pipelines,...

Read more
Three precise river crossings in Innsbruck

In March and April 2023, Brownline surveyed three HDD crossings in Innsbruck, Austria. With the Alps in the background,...

Read more
Drilling through the dunes on Norderney for offshore wind energy

In the summer of 2022, Brownline surveyed four parallel drillings on the German island of Norderney. In order to complete...

Read more
HDD outfalls for high voltage cables in Scotland

In the summer of 2022, Brownline surveyed two pilot bores in Scotland. These were outfalls to install high voltage power...

Read more
14 bores for wind farm Maasvlakte 2

In May and June 2022, Brownline has contributed to the construction of a large wind farm on the beach of Maasvlakte 2,...