Baltic pipeline continued: drilling in Denmark

In 2021 we participated in the construction of the Baltic Pipeline; a 900 km long cross-border natural gas pipeline in...

Read more
Catching the ferry for more power

In the fall of 2021, Brownline surveyed a 583-meter long bore under the Gieseplas Lake in The Netherlands. This was the...

Read more
Drilling while floating in Szczecin, Poland

In 2021, Brownline was able to make a significant contribution to a project near the city of Szczecin in Poland. We were...

Read more
Preparing a hundred-year-old hydroelectric power station for the future with Drillguide GST!

In the summer of 2021, Brownline surveyed a 281-meter long bore at a beautiful location, in the middle of the Austrian...

Read more
Expansion of the drinking water supply in two Dutch provinces

In 2021, Brownline was able to make a significant contribution to the expansion of the drinking water supply in the Dutch...

Read more
Four drill jobs for the European fuel pipeline network

A pipeline system for the supply of aviation fuel to various national and international airports runs right through the...

Read more