Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Crossing a Scottish loch with three parallel power cables

In 2021, Brownline was involved in three parallel drillings in north-west Scotland. It was an interesting and challenging...

Read more
Solar park connection under a natural area

In May 2022, Brownline contributed to a drilling project near Lemmer, in the province of Friesland. Drilling company Klever...

Read more
Drilling over 6000 feet under a Danish canal!

In 2021, Brownline was involved in a challenging and lengthy drilling project: installing a fiber optic cable spanning...

Read more
New pipes for water softening plant WPC Bilzen

In the fall of 2021, Brownline's tools were used by drilling company Van den Berg to replace a network of water pipes...

Read more
Baltic pipeline continued: drilling in Denmark

In 2021 we participated in the construction of the Baltic Pipeline; a 900 km long cross-border natural gas pipeline in...

Read more
Catching the ferry for more power

In the fall of 2021, Brownline surveyed a 583-meter long bore under the Gieseplas Lake in The Netherlands. This was the...

Read more