Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
14 bores for wind farm Maasvlakte 2

In May and June 2022, Brownline has contributed to the construction of a large wind farm on the beach of Maasvlakte 2,...

Read more
Complicated intersect drilling in Texan marsh

In March 2022, Brownline USA surveyed a long and challenging drilling in Port Arthur, TX. This 8753 ft / 2668 m bore led...

Read more
Drilling across a marshy area for Shell’s Zydeco pipeline

In the summer of 2020, Brownline USA’s Drillguide Gyro Steering Tool was instrumental in constructing a pipeline...

Read more
Crossing a Scottish loch with three parallel power cables

In 2021, Brownline was involved in three parallel drillings in north-west Scotland. It was an interesting and challenging...

Read more
Climbing a river slope for safer pipelines in northeastern Alberta

In January 2022, Brownline Canada steered two parallel pilot bores near Fort McMurray, Alberta. The two steel pipes are...

Read more
Solar park connection under a natural area

In May 2022, Brownline contributed to a drilling project near Lemmer, in the province of Friesland. Drilling company Klever...

Read more