Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Uphill drilling in the Moselle Valley in Germany to connect a solar farm

In December 2023, Brownline surveyed an HDD crossing to install solar energy cables in the German town of Sankt Aldegund....

Read more
Accurate drilling in iron-rich soil without interference thanks to the Drillguide Gyro Steering Tool!

In July and September 2024, Brownline Canada provided steering services on two HDD crossings in the Marten Hills oil and...

Read more
More than 20 HDDs for 23 km / 14 mi long gas pipeline

Between May and September 2024, Brownline has surveyed a large number of horizontal directional drills to install a new...

Read more
Challenging HDD intersect crossing under Kiskatinaw River, British Columbia

In November 2022, Brownline Canada provided its steering services to successfully complete an HDD crossing under the Kiskatinaw...

Read more
Drilling under a river in a protected natural area in France

In December 2023, Brownline contributed to the replacement of a gas pipeline under the Adour River in the French department...

Read more
Challenging HDD intersect to cross wetlands near Surrey, BC

In September 2023, Brownline Canada made a major contribution to a pipeline project in British Columbia. In a wetlands...

Read more
Cookie policy