Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
120° horizontal curve drill job, Leiden, The Netherlands

In the spring of 2020, Brownline has contributed to the construction of a wind farm with a 664 meter long drill with the...

Read more
Waitemata Harbour

From late 2019 to early 2020, Brownline Australia has executed 3 drills below Waitemata Bay Harbour. These drills are...

Read more
Baptizing the GPS Track at Antwerp Port, Belgium

In the busy Port of Antwerp, Brownline has performed 3 drills with the Radar and GPS Track in 2019. This project marked...

Read more
District heating in Rotterdam, The Netherlands

A connection for the district heating system in Rotterdam needed to be installed under a part of the port of the city....

Read more
Detroit River Crossing - USA & Canada border

In 2019, our experienced personnel from both sides of the border teamed up to complete the 3940ft (1200m) crossing under...

Read more
Centimeter-precise punch-out in Dordrecht, The Netherlands

In this project Brownline realized a long drill with a 60° horizontal curve. Accuracy at the exit point was paramount...

Read more