Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Victoria Harbour crossing

Our Canadian operations are proud to have assisted in the completion of a 940m crossing under Victoria Harbour in 2019...

Read more
Crossing Calgary International Airport

In 2019, Brownline Canada has completed a 1094m crossing for a 12” pipeline, which is now responsible for the safe...

Read more
District heating in Rotterdam, The Netherlands

A connection for the district heating system in Rotterdam needed to be installed under a part of the port of the city....

Read more
Pressure-While-Drilling (PWD) protects the old inner city of Bruges

A well-known Belgian brewery commissioned a pipeline to transport their beer. The pipeline would run straight through...

Read more
Railway drainage system installation in Melbourne, Australia

In 2016, Brownline was called in to provide steering services in Australia for drills that were realized to install multiple...

Read more