Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Crossing the busiest canal in the world without interference

In January 2024, Brownline surveyed a crossing of nearly 400 m / 1300 ft under the Amsterdam-Rhine Canal for our client...

Read more
Drilling leak detection conduits alongside a steel pipeline in British Columbia

Between August and November 2023, Brownline Canada was contracted to complete several crossings along a 36” steel...

Read more
Four HDD crossings for undergrounding of 150 kV lines

In September 2023, Brownline contributed to four directional drillings in Breda. Here, an overhead powerline above the...

Read more
Crossing the Yarra River in Melbourne, Australia

In the fall of 2022, Brownline Australia surveyed an HDD crossing under the Yarra River. Three-quarters of the HDD’s...

Read more
Drilling to expand the power grid in Friesland

In 2022, Brownline was involved in the construction of a long cable connection in the Dutch province of Friesland. Between...

Read more
Long parallel crossings under many obstacles in Rijswijk

In June 2023, Brownline contributed to the completion of two parallel crossings in Rijswijk. To install heat pipelines,...

Read more